Exact Approaches to Late Work Scheduling on Unrelated Machines
INTERNATIONAL JOURNAL OF APPLIED MATHEMATICS AND COMPUTER SCIENCE(2023)
摘要
We consider the scheduling problem on unrelated parallel machines in order to minimize the total late work. Since the problem is NP-hard, we propose a mathematical model and two dedicated exact approaches for solving it, based on the branching and bounding strategy and on enumerating combined with a dynamic programming algorithm. The time efficiencies of all three approaches are evaluated through computational experiments.
更多查看译文
关键词
late work scheduling, unrelated machines, mathematical model, branch-and-bound algorithm, dynamic programming