Key Construction Techniques of East Tower and Anchorage of Lingdingyang Bridge in Shenzhong Link

Hong Zhang, Hang Yuan,Hehui Zheng

IABSE Congress, Nanjing 2022: Bridges and Structures: Connection, Integration and HarmonisationIABSE Congress Reports(2022)

引用 0|浏览0
暂无评分
摘要

Lingdingyang Bridge of Shenzhong Link is a three-span suspension bridge with a full floating system of 580 + 1666 + 580. In view of the complex construction conditions of the bridge site, the construction scheme of island cofferdam was proposed for the east anchorage, and the flexible combined island cofferdam structure of ' lock steel pipe pile + I-shaped sheet pile + parallel steel wire rope ' was innovatively adopted to transform the offshore construction into land construction. For the east cable tower, the flexible manufacturing production line of steel mesh was developed, and the integrated intelligent tower building equipment suitable for ultra-high concrete cable tower was developed, forming the industrial construction technology of ultra-high cable tower based on reinforced bar product and intelligent tower building. The key construction technology of anchorage and tower solves the construction problem of super long-span suspension bridge in offshore sea, and improves the intelligent and industrial construction level of ultra-high tower engineering.

更多
查看译文
关键词
lingdingyang bridge,shenzhong link,east tower,construction
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要