Dénoyer une galerie en charge pour améliorer la flexibilité d’une centrale hydroélectrique

LHB(2022)

引用 0|浏览1
暂无评分
摘要
ReSUMe Le developpement des nouvelles sources d'energie renouvelable de nature intermittente necessite de disposer de sources d'energie flexibles egalement d'origine renouvelable afin de garantir la stabilite du reseau electrique et les engagements environnementaux. Dans le cadre du projet pilote et demonstrateur << SmallFlex >>, l'augmentation de la flexibilite d'une petite centrale hydroelectrique au fil de l'eau, equipee de deux turbines Pelton, a ete etudiee. La particularite de cette centrale haute chute d'une puissance installee de 14 MW est l'absence d'une retenue d'eau en amont reduisant la capacite de reglage qui se limite a la prediction du debit d'apport. Pour accroitre la flexibilite de cette centrale un volume de stockage comprenant le dessableur, la chambre de mise en charge et la partie superieure de la galerie a ete identifie. La presente etude se concentre sur la possibilite technique d'utiliser ce volume a l'aide d'etudes analytiques, d'essais sur modele reduit et de mesures sur site. En complement, des simulations numeriques 1D ont permis de definir la plage de reglage primaire envisageable en considerant ce volume supplementaire. Enfin, l'analyse economique montre la possibilite d'augmenter la production hivernale et de proposer un service de reglage primaire toute l'annee grace a ce volume de stockage supplementaire. The development of new stochastic sources of renewable energy requires the availability of flexible energy sources also renewable to guarantee the stability of the electricity grid and the environmental commitments. As part of the "SmallFlex" pilot and demonstrator project, the increase in flexibility of a small run-of-river hydroelectric power station, equipped with two Pelton turbines, has been studied. The particularity of this high-head plant, with an installed capacity of 14 MW, is the absence of an upstream reservoir, which limits the control of the production to the prediction of the incoming flow. To increase the capacity of this plant, a storage volume including the grit chamber, the forebay tank and the upper part of the gallery has been identified. The present study focuses on the technical possibility of using this volume by performing analytical studies, scale model tests and on-site measurements. In addition, 1D digital simulations have identified the possibility to provide a primary control service to the grid by using this additional volume. Finally, the economic analysis shows the possibility of increasing the winter production and offering a primary control service thanks to this additional storage volume.
更多
查看译文
关键词
Turbine pelton, denoyage galerie, flexibilite, service systeme, Pelton turbine, dewatering, flexibility, primary control
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要