Assessment of Grid Limiting Factor to Enhance Net-Energy Metering Schemes for Industrial PV System in Bangladesh

2021 International Conference on Automation, Control and Mechatronics for Industry 4.0 (ACMI)(2021)

引用 2|浏览1
暂无评分
摘要
This paper aims to address the economic feasibility of different metering schemes for grid-connected industrial PV systems in Bangladesh. An on-grid PV system is designed for an industrial load and a comparative assessment amongst net energy metering and net billing is carried out under two different scenarios – without any grid limit and with grid limit. The base case simulation was done among each case and further sensitivity analysis was performed. The metering schemes are compared based on system net present value, payback period, annual net savings for different PV installation, net energy delivered to the grid and cost analysis. Sensitivity analysis shows how grid limiting factor affects the overall PV energy scenario. Finally, the most promising tariff alternative is identified for the large-scale implementation of grid-connected industrial PV system in Bangladesh.
更多
查看译文
关键词
net energy metering,net billing,net excess generation,tariff scheme,net present value,payback period,sensitivity analysis,grid limiting factor
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要