Optimal inspection and replacement strategy for 145 kV gas-insulated switchgear

PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART O-JOURNAL OF RISK AND RELIABILITY(2022)

引用 0|浏览0
暂无评分
摘要
We deal with an optimization problem of planning a maintenance strategy for 145 kV gas-insulated switchgear and apply reliability-centered maintenance approach to find an efficient and effective strategy. In a three-step sequential process, we use failure mode effects and criticality analysis to define the critical failure modes that cause the major failures of 145 kV gas-insulated switchgear, select the maintenance significant items to remove the major failure modes, and finally apply logic tree analysis to assign the appropriate maintenance task to each critical failure modes in the system. We then compare the assigned maintenance tasks with existing tasks in the installation, operation, and maintenance manuals developed in the system design and development phase. The assigned maintenance tasks in this study are compared with those in the system design and development phase by simulation, and a simple heuristic method is proposed to find optimal solutions.
更多
查看译文
关键词
GIS, RCM, FMECA, LTA, simulation
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要