Improving Long-Lead Seasonal Forecasts Of Precipitation Over Southern China Based On Statistical Downscaling Using Bcc_csm1.1m
DYNAMICS OF ATMOSPHERES AND OCEANS(2021)
摘要
Long-lead precipitation forecasts for 1-4 seasons ahead are usually difficult in dynamical climate models due to the model deficiencies and the limited persistence of initial signals. But, these forecasts could be empirically improved by statistical approaches. In this study, to improve the seasonal precipitation forecast over the southern China (SC), the statistical downscaling (SD) models are built by using the predictors of atmospheric circulation and sea surface temperature (SST) simulated by the Beijing Climate Center Climate System Model version 1.1 m (BCC_CSM1.1 m). The different predictors involved in each SD model is selected based on both its close relationship with the target seasonal precipitation and its reasonable prediction skill in the BCC_CSM1.1 m. Cross and independent validations show the superior performance of the SD models, relative to the BCC_CSM1.1 m. The temporal correlation coefficient of SD models could reach > 0.4, exceeding the 95 % confidence level. The SC precipitation index can be much better forecasted by the SD models than by the BCC_CSM1.1 m in terms of the interannual variability. In addition, the errors of the precipitation forecast in all four seasons are significantly reduced over most of SC in the SD models. For the 2015/2016 strong El Nino event, the SD models outperform the dynamical BCC_CSM1.1 m model on the spatial and regional-average precipitation anomalies, mostly due to the effective SST predictor in the SD models and the weak response of the SC precipitation to El Nino-related SST anomalies in the BCC_CSM1.1 m.
更多查看译文
关键词
Four-season precipitation forecast, Southern China, BCC_CSM1.1m, Statistical downscaling
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要