A significant pre-stressing deviation from the pre-stressing target force is induced by the temperature change and sliding friction between hoop cables and cable-strut joints during the pre-stressing construction of suspen-dome structures. The deviation not only induces a considerable increase in member stress and nodal displacement but also reduces the load-bearing capacity of suspen-dome structures. To reduce this pre-stressing deviation, construction measures such as the use of a sufficient number of pre-stressing points, over pre-stressing construction, adoption of rolling cable-strut joints, and modification of the pre-stressing control value with temperature change were developed. A suspen-dome specimen with a diameter of 10.8 m was designed to clarify the aforementioned construction measures. Six schemes were designed and implemented based on this specimen. Finite element analysis was then conducted. Experimental and numerical results indicated that the construction measures presented in this paper could effectively reduce pre-stressing force deviation.
更多
查看译文
关键词
Suspen-dome structures,Pre-stressing construction,Pre-stressing force deviation,Temperature change,sliding friction,Cable-strut joints,Experimental study,Numerical analysis
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要