L. Bagby, B. Baibussinov, B. Behera,V. Bellini,R. Benocci, M. Betancourt, M. Bettini,M. Bonesini, T. Boone, A. Braggiotti,J. D. Brown, H. Budd, F. Calaon, L. Castellani, S. Centro, A. G. Cocco, M. Convery,F. Fabris,A. Falcone, C. Farnese,A. Fava, F. Fichera, M. Giarin, D. Gibin,A. Guglielmi,R. Guida, C. Hilgenberg, B. Howard, W. Ketchum, S. Marchini,A. Menegolli,G. Meng,C. Montanari,M. Mooney, G. Moreno Granados, J. Mueller, M. Nessi, M. Nicoletto, R. Pedrotta, R. Peghin,G. Petrillo, F. Pietropaolo, G. Rampazzo, A. Rappoldi,G. L. Raselli, M. Rossella, C. Rubbia, A. Scaramelli, F. Sergiampietri, M. Spanu, D. Torretta,M. Torti,F. Tortorici,Y. T. Tsai, M. Turcato, F. Varanini, F. Vercellati,S. Ventura, C. Vignoli, D. Warner,R. J. Wilson, M. Worcester,A. Zani, P. G. Zatti

JOURNAL OF INSTRUMENTATION(2021)

引用 7|浏览17
暂无评分
摘要
The ICARUS T600 liquid argon (LAr) time projection chamber (TPC) underwent a major overhaul at CERN in 2016-2017 to prepare for the operation at FNAL in the Short Baseline Neutrino (SBN) program. This included a major upgrade of the photo-multiplier system and of the TPC wire read-out electronics. The full TPC wire read-out electronics together with the new wire biasing and interconnection scheme are described. The design of a new signal feed-through flange is also a fundamental piece of this overhaul whose major feature is the integration of all electronics components onto the signal flange. Initial functionality tests of the full TPC electronics chain installed in the T600 detector at FNAL are also described.
更多
查看译文
关键词
Data acquisition circuits, Front-end electronics for detector readout, Neutrino detectors, Time projection chambers
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要