Completion of the 8 MW Multi-Frequency ECRH System at ASDEX Upgrade

D. Wagner,J. Stober,M. Kircher,F. Leuterer,F. Monaco, M. Munich,M. Schubert,H. Zohm,G. Gantenbein,J. Jelonnek, M. Thumm,A. Meier,T. Scherer,D. Strauss,W. Kasparek,C. Lechte,B. Plaum,A. Zach,A.G. Litvak,G.G. Denisov,A. Chirkov, V. Malygin, L.G. Popov, V.O. Nichiporenko, V.E. Myasnikov, E.M. Tai, E.A. Solyanova

2019 44th International Conference on Infrared, Millimeter, and Terahertz Waves (IRMMW-THz)(2019)

引用 1|浏览99
暂无评分
摘要
Over the last 15 years, the Electron Cyclotron Resonance Heating (ECRH) system at the ASDEX Upgrade tokamak has been upgraded from a 2 MW, 2 s, 140 GHz system to an 8 MW, 10 s, dual frequency system (105/140 GHz). Eight gyrotrons were in routine operation during the current experimental campaign. All gyrotrons are step-tunable operating at 105 and 140 GHz with a maximum output power of about 1 MW and 10 s pulse length. The system includes 8 transmission lines, mainly consisting of oversized corrugated waveguides (I.D. = 87 mm) with overall lengths between 50 and 70 meters including quasi-optical sections at both ends. Further improvements of the transmission lines with respect to power handling and reliability are underway.
更多
查看译文
关键词
gyrotrons,routine operation,step-tunable operating,maximum output power,pulse length,transmission lines,multifrequency ECRH system,electron cyclotron resonance heating system,ASDEX Upgrade tokamak,dual frequency system,corrugated waveguides,quasi-optical section,power handling,reliability,power 8.0 MW,frequency 140.0 GHz,time 10.0 s,frequency 105.0 GHz,power 1.0 MW,size 87.0 mm,power 2.0 MW,time 2.0 s,size 50 m to 70 m
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要