Characteristics of the microseismicity resulting from the construction of a deeply-buried shaft

Tunnelling and Underground Space Technology(2019)

引用 14|浏览14
暂无评分
摘要
The China Jinping Underground Laboratory phase II (CJPL-II) is currently the world’s deepest laboratory with a maximum overburden over 2.4 km. For this project, a deeply-buried shaft was constructed on the floor of the existing large-span laboratories under conditions involving high geo-stress. To explore the failure characteristics encountered and optimize the excavation and support scheme of the shaft, an in situ microseismic (MS) monitoring experiment was carried out. Firstly, an appropriate monitoring scheme was developed for this special project (i.e. the details of the sensor array required, velocity model, and system protection). Secondly, the location accuracy of the monitoring system was analyzed. On this basis, the effect of excavation and support on the fracturing processes induced in the surrounding rock was analyzed by interpreting the MS information. Thirdly, the spatial relationship between the potential damage zones and direction of the maximum principal stress was validated by analyzing the spatiotemporal evolution of the MS activity with the help of numerical simulations. In addition, some suggestions for excavation and support schemes are provided based on the monitoring results. Hence, the MS monitoring scheme and results described in this paper constitute a reference for construction design and MS monitoring of similar projects.
更多
查看译文
关键词
High geo-stress,Deeply-buried shaft,Microseismic monitoring,Acoustic velocity testing,EPCA3D,China Jinping Underground Laboratory
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要