Mixed-criticality processing pipelines

DATE(2017)

引用 26|浏览98
暂无评分
摘要
While a number of schemes exist for mixed-criticality scheduling in a single processor setting, no solution exists to cover the industry need for end-to-end scheduling across multiple processors in a pipeline. In this paper, we present an end-to-end zero-slack rate-monotonic scheme (ZSRM) based on real-time pipelines, called the ZSRM pipeline scheduler, that addresses this need. Under ZSRM, each task is associated with a parameter called zero-slack instant, and whenever a higher-criticality job has not finished at its zero-slack instant relative to its arrival time, all jobs of lower criticality are suspended to meet the deadline of the higher-criticality job. We develop a new schedulability test and algorithm for computing the zero-slack instants of tasks scheduled across a pipeline.
更多
查看译文
关键词
mixed-criticality processing pipelines,end-to-end scheduling,multiple processors,end-to-end zero-slack rate-monotonic scheme,ZSRM pipeline scheduler,zero-slack instant,higher-criticality job deadline,schedulability test
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要