Optimized Implementation of Multirate Mixed-Criticality Synchronous Reactive Models.

ACM Transactions on Design Automation of Electronic Systems (TODAES)(2017)

引用 6|浏览32
暂无评分
摘要
Model-based design using Synchronous Reactive (SR) models enables early design and verification of application functionality in a platform-independent manner, and the implementation on the target platform should guarantee the preservation of application semantic properties. Mixed-Criticality Scheduling (MCS) is an effective approach to addressing diverse certification requirements of safety-critical systems that integrate multiple subsystems with different levels of criticality. This article considers fixed-priority scheduling of mixed-criticality SR models, and considers two scheduling approaches: Adaptive MCS and Elastic MCS. We formulate the optimization problem of minimizing the total system cost of added functional delays in the implementation while guaranteeing schedulability, and present an optimal algorithm based on branch-and-bound search, and an efficient heuristic algorithm.
更多
查看译文
关键词
Real-time scheduling,synchronous reactive model,mixed-criticality systems
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要