A preliminary thermo-hydraulic analysis was performed on the ITER diagnostic upper port plug. Relevant thermal and hydraulic parameters, such as coolant pressure drop, maximum structure temperature and bake-out time, were calculated for normal operation and baking. The tipper port plug considered is based on the preliminary generic structure design of Princeton Plasma Physics Laboratory and the Blanket Shield Module (BSM) developed in Europe. The diagnostic shield modules are modeled so that the Korean diagnostic procurement package, which includes Vacuum Ultra-Violet (VUV) spectrometer and neutron activation system, can be integrated. The analysis provides design inputs to optimize flow in the cooling channels of the plug. The conjugated heat transfer analysis for the port plug confirms that it is important to secure accurate nuclear heat and accurate electro-magnetic (EM) force for the design of the joining flange between the BSM and the main body. Thermal analysis shows that it will take ten hours for the port plug to reach the bake-out temperature (240 degrees C), if the window plate is heated additionally from the rear side.
更多
查看译文
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要