Two-Agent Single-Machine Scheduling of Jobs with Time-Dependent Processing Times and Ready Times

MATHEMATICAL PROBLEMS IN ENGINEERING(2013)

引用 6|浏览15
暂无评分
摘要
Scheduling involving jobs with time-dependent processing times has recently attracted much research attention. However, multiagent scheduling with simultaneous considerations of jobs with time-dependent processing times and ready times is relatively unexplored. Inspired by this observation, we study a two-agent single-machine scheduling problem in which the jobs have both time-dependent processing times and ready times. We consider the model in which the actual processing time of a job of the first agent is a decreasing function of its scheduled position while the actual processing time of a job of the second agent is an increasing function of its scheduled position. In addition, each job has a different ready time. The objective is to minimize the total completion time of the jobs of the first agent with the restriction that no tardy job is allowed for the second agent. We propose a branch-and-bound and several genetic algorithms to obtain optimal and near-optimal solutions for the problem, respectively. We also conduct extensive computational results to test the proposed algorithms and examine the impacts of different problem parameters on their performance.
更多
查看译文
关键词
Scheduling,Dynamic Scheduling
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要