Real-time drill monitoring and control using building information models augmented with 3D imaging data

Automation in Construction(2013)

引用 39|浏览16
暂无评分
摘要
The problem of placing embeds into existing reinforced concrete structures without damaging reinforcement bars is an industry-wide challenge for the construction industry. This paper presents research that investigated real-time monitoring approaches for hazardous engineering processes. A conceptual solution for processing and incorporating point cloud data obtained from 3D imaging technologies11Disclaimer: Certain commercial entities, equipment, or materials may be identified in this document in order to describe an experimental procedure or concept adequately. Such identification is not intended to imply recommendation or endorsement by the National Institute of Standards and Technology or the University of Michigan, nor is it intended to imply that the entities, materials, or equipment are necessarily the best available for the purpose. into the drilling process in was developed. The 3D imaging technologies were used to map the locations of rebar within a section of a railway bridge deck. Once the point clouds were processed, zones which are safe for drilling were automatically detected and saved as a Building Information Model (BIM). The BIM was used to provide real-time feedback to the drill operator about whether it is safe to continue drilling based on the position and orientation of the drill. The results showed the feasibility of real-time feedback for improving the safety, productivity, and quality of engineering processes by helping avoid the time and cost of rework.
更多
查看译文
关键词
Monitoring,Real-time visualization,Context-aware computing,Concrete decks,Embeds
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要