Development of advanced gyrotrons

Infrared, Millimeter, and Terahertz waves(2014)

引用 3|浏览100
暂无评分
摘要
Beyond ITER, a future nuclear fusion demonstration power plant (DEMO) demands gyrotron frequencies above 200 GHz and gyrotron efficiencies of higher than 60 %. The unit power must well exceed 1 MW. Fast frequency tunability in steps of 2-3 GHz (in a few seconds) using broadband or tunable CVD-diamond windows is required. Beside these fundamental requirements, slow frequency tunability (in a few minutes) in leaps of 30-40 GHz, related to the transmission maxima of plane CVD-diamond windows is considered to be advantageous for a possible multi-purpose use of these future gyrotrons. Initial feasibility studies have been performed already. Physical design studies, including the cavity, magnetron injection gun (MIG), quasi-optical output coupler and collector, have been started. This presentation will provide a comprehensive overview of the feasibility, constraints, basic design ideas and current status in the development.
更多
查看译文
关键词
tokamak devices,chemical vapour deposition,fusion reactor design,gyrotrons,plasma toroidal confinement,demo,fast frequency tunability,magnetron injection gun,nuclear fusion demonstration power plant,quasi-optical output coupler,slow frequency tunability,tunable cvd-diamond windows
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要