Minimizing the Number of Tardy Jobs in a Permutation Flowshop Scheduling Problem with Setup Times and Time Lags Constraints

Journal of Mathematical Modelling and Algorithms in Operations Research(2012)

引用 17|浏览0
暂无评分
摘要
This paper studies the permutation flowshop scheduling problem with sequence dependent setup times and time lags constraints minimizing the number of tardy jobs. Dependent setup times are defined as the work to prepare the machines between two successive jobs. Time lags are defined as intervals of time that must exist between every couple of successive operations of the same job. Two mathematical programming formulations are proposed for the considered problem. A simulated annealing algorithm is also developed to solve the problem. Computational experiments are presented and discussed.
更多
查看译文
关键词
Permutation flowshop,Setup times,Time lags,Mathematical programming,Simulated annealing