Preparing for JWST wavefront sensing and control operations

Proceedings of SPIE(2016)

引用 17|浏览7
暂无评分
摘要
The James Webb Space Telescopes segmented primary and deployable secondary mirrors will be actively controlled to achieve optical alignment through a complex series of steps that will extend across several months during the observatory's commissioning. This process will require an intricate interplay between individual wavefront sensing and control tasks, instrument-level checkout and commissioning, and observatory-level calibrations, which involves many subsystems across both the observatory and the ground system. Furthermore, commissioning will often exercise observatory capabilities under atypical circumstances, such as fine guiding with unstacked or defocused images, or planning targeted observations in the presence of substantial time-variable offsets to the telescope line of sight. Coordination for this process across the JWST partnership has been conducted through the Wavefront Sensing & Control Operations Working Group. We describe at a high level the activities of this group and the resulting detailed commissioning operations plans, supporting software tools development, and ongoing preparations activities at the Science & Operations Center. For each major step in JWST's wavefront sensing and control, we also explain the changes and additions that were needed to turn an initial operations concept into a flight-ready plan with proven tools. These efforts are leading to a robust and well-tested process and preparing the team for an efficient and successful commissioning of JWSTs active telescope.
更多
查看译文
关键词
JWST,Wavefront Sensing and Controls,Operations
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要