Increasing the Available Water Diversion Volume of Water Source Project Through Flood Resource Utilization: A Case Study of the Middle Route of the South-to-North Water Diversion Project in China
RELIABILITY ENGINEERING & SYSTEM SAFETY(2025)
Key words
Water diversion project,Available water diversion volume,Flood limited water level,Conditional value-at-risk,Flood resource utilization
AI Read Science
Must-Reading Tree
Example

Generate MRT to find the research sequence of this paper
Chat Paper
Summary is being generated by the instructions you defined