Analisis Akar Penyebab Risiko K3 Pelaksanaan Pekerjaan Abutment dan Pemasangan Girder Metode Fault Tree Analysis (FTA) Proyek Tol Solo – NYIA Kulon Progo

Balqis Sajidah Salim,Anik Ratnaningsih,Syamsul Arifin

Teras Jurnal: Jurnal Teknik Sipil(2024)

引用 0|浏览0
暂无评分
摘要
Abstrak Jalan Tol Solo-NYIA Kulon Progo menjadi proyek utama pembangunan Indonesia yang memiliki komponen seperti girder, abutment, dan sebagainya. Menurut data BPJS ketenagakerjaan terhitung sejak 2020 hingga 2022 terjadi peningkatan pada kecelakaan kerja. Sehingga perlu adanya evaluasi penerapan K3 dan faktor risiko terjadi. Metode yang digunakan adalah Fault Tree Analysis untuk mendapatkan akar penyebab dari risiko tersebut. Hasil analisis Fault Tree Analysis (FTA) didapatkan risiko dominan pada pekerjaan Abutment yaitu jalanan berdebu, tertusuk besi beton, dan terjatuh dari ketinggian. Risiko dominan pada pemasangan girder didapatkan hasil PCL girder terguling/terjatuh, Iritasi mata, dan Trailer terperosok. Akar penyebab risiko dari pekerjaan abutment dan pemasangan girder disebabkan dari beberapa faktor yaitu faktor manusia, faktor manajemen, faktor teknis dan faktor lingkungan. Respon risiko diantaranya selalu berhati hati dalam bekerja, melakukan pergantian shift pekerja, menggunakan APD lengkap, melakukan toolbox meeting, mengadakan safety induction dan safety talk, melakukan inspeksi alat, serta operator sebelum memulai pekerjaan, dan menerapkan SOP yang benar. Kata kunci: Kecelakaan kerja, Faul Tree Analysis, Manajemen Risiko, Abstract Toll roads are the main projects of Indonesia's development that have components such as girders, abutments, etc. According to BPJS data, from 2020 to 2022 there has been an increase in work accidents. So it is necessary to evaluate the application of Occupational Health and Safety (OHS) and risk factors. The method used is Fault Tree Analysis to obtain the root cause of the risk. The results of the Fault Tree Analysis (FTA) analysis found the dominant risk in Abutment work, dusty roads, punctured by concrete iron, and falls from a height. The dominant risk in girder installation is obtained from PCL girder rollover/fall, eye irritation, and trailer mired. The root cause of risk from abutment work and girder installation is caused by several factors, there are human factors, management factors, technical factors and environmental factors. Risk responses include always being careful at work, changing worker shifts, using full PPE, conducting toolbox meetings, holding safety induction and safety talks, inspecting equipment, and operators before work, and implementing the correct operating procedures. Keywords: OHS, Risk management, Fault Tree Analysisis
更多
查看译文
关键词
ohs,risk management,fault tree analysisis
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要