Delay Analysis of Multi-Hop Satellite-Terrestrial Networks with Hybrid RF/FSO Links
ICC 2023 - IEEE INTERNATIONAL CONFERENCE ON COMMUNICATIONS(2023)
摘要
Industry and academics have shown a strong interest in satellite-terrestrial networks combined with new technologies such as free-space optics (FSO). We propose a downlink satellite-terrestrial network solution combining FSO with site diversity and multi-hop hybrid radio-frequency (RF)/FSO links. Although the proposed network architecture is a cost-effective solution with wide coverage and immunity against different weather conditions, the multi-hop links can degrade its delay performance. Hence, we analyze the network dropping probability and latency to address the hop-count problem for various applications. We validated the derived network performance by Monte-Carlo simulation and showed that this setting could support ultra low latency applications such as medical applications with latency between 3-10 milliseconds, audio/video 2-50 milliseconds, and augmented reality 7-20 milliseconds. Also, the proposed network guarantees 98 % data delivery with 20 nodes.
更多查看译文
关键词
Satellite-terrestrial networks,delay analysis,site diversity,free-space optical (FSO),hybrid radio frequency (RF)/FSO,queuing system
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要