Implementation strategies to build mental health-care capacity in Malawi: a health-economic evaluation.

The Lancet. Global health(2024)

引用 0|浏览2
暂无评分
摘要
BACKGROUND:Depression is a major contributor to morbidity and mortality in sub-Saharan Africa. Due to low system capacity, three in four patients with depression in sub-Saharan Africa go untreated. Despite this, little attention has been paid to the cost-effectiveness of implementation strategies to scale up evidence-based depression treatment in the region. In this study, we investigate the cost-effectiveness of two different implementation strategies to integrate the Friendship Bench approach and measurement-based care in non-communicable disease clinics in Malawi. METHODS:The two implementation strategies tested in this study are part of a trial, in which ten clinics were randomly assigned (1:1) to a basic implementation package consisting of an internal coordinator acting as a champion (IC-only group) or to an enhanced package that complemented the basic package with quarterly external supervision, and audit and feedback of intervention delivery (IC + ES group). We included material costs, training costs, costs related to project-wide meetings, transportation and medication costs, time costs related to internal champion activities and depression screening or treatment, and costs of external supervision visits if applicable. Outcomes included the number of patients screened with the patient health questionnaire 2 (PHQ-2), cases of remitted depression at 3 and 12 months, and disability-adjusted life-years (DALYs) averted. We compared the cost-effectiveness of both packages to the status quo (ie, no intervention) using a micro-costing-informed decision-tree model. FINDINGS:Relative to the status quo, IC + ES would be on average US$10 387 ($1349-$17 365) more expensive than IC-only but more effective in achieving remission and averting DALYs. The cost per additional remission would also be lower with IC + ES than IC-only at 3 months ($119 vs $223) and 12 months ($210 for IC + ES; IC-only dominated by the status quo at 12 months). Neither package would be cost-effective under the willingness-to-pay threshold of $65 per DALY averted currently used by the Malawian Ministry of Health. However, the IC + ES package would be cost-effective in relation to the commonly used threshold of three times per-capita gross domestic product per DALY averted. INTERPRETATION:Investing in supporting champions might be an appropriate use of resources. Although not currently cost-effective by Malawian willingness-to-pay standards compared with the status quo, the IC + ES package would probably be a cost-effective way to build mental health-care capacity in resource-constrained settings in which decision makers use higher willingness-to-pay thresholds. FUNDING:National Institute of Mental Health.
更多
查看译文
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要