Poverty-Food Insecurity Nexus in the Post-Construction Context of a Large Hydropower Dam in the Brazilian Amazon.

International journal of environmental research and public health(2024)

引用 0|浏览0
暂无评分
摘要
Within the 2030 Sustainable Development Agenda, large hydropower dams are positioned as a sustainable energy source, notwithstanding their adverse impacts on societies and ecosystems. This study contributed to ongoing discussions about the persistence of critical social issues, even after the investments of large amounts of resources in areas impacted by the construction of large hydropower dams. Our study focused on food insecurity and evaluated this issue in the city of Altamira in the Brazilian Amazon, which has been profoundly socially and economically impacted by the construction, between 2011 and 2015, of Brazil's second-largest dam, namely, Belo Monte. A survey in Altamira city featured a 500-household random sample. Structural equation modeling showed conditioning factors of 60% of the population experiencing varying food insecurity degrees. Poverty, female-led households, lower education, youth, and unemployment were strongly linked to higher food insecurity. Crowded, officially impacted, and resettled households also faced heightened food insecurity. Our findings underscore the food insecurity conditions in the region impacted by the Belo Monte dam, emphasizing the need to take into account this crucial issue while planning and implementing hydropower dams.
更多
查看译文
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要