Simulation-Based Analysis of Onshore Wind Farm Installation Strategies.

Winter Simulation Conference(2023)

引用 0|浏览0
暂无评分
摘要
Wind energy constitutes a main contributor to clean and renewable energy. While the offshore sector has received much attention from research and industry, onshore wind farms still make up the largest share of installation projects. Thereby, onshore installations retain similar wind speed restrictions as their offshore counterparts but additionally introduce limits and wait time restrictions between installation operations. This article proposes extending a planning method initially designed for offshore wind farms to cover these additional requirements and proposes a simulation model capable of evaluating the resulting plans. The results show that the extended approach prevents violations of these requirements, mitigates the influence of weather forecast uncertainties, and provides efficient plans for installation operations.
更多
查看译文
关键词
Wind Farm,Onshore Wind Farms,Installation Of Wind Farms,Simulation Model,Renewable Energy,Wind Power,Waiting Time,Planning Methods,Efficient Planning,Offshore Wind,Influence Of Uncertainty,Offshore Wind Farms,Time Window,Optimal Model,Discrete-time,Higher Threshold,Weather Data,Main Agent,Original Approach,Optimal Plan,Rolling Horizon,Maximum Wind,Planning Horizon,Maximum Wind Speed,End Of Window,Benchmark Approaches,Installation Process,Makespan,Benchmark Algorithms,Acceptable Threshold
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要