A New Residual Subsidence Prediction Method of Short Working Face Goaf for Safety Construction of Urban Viaduct

Environmental Science and Pollution Research(2024)

引用 0|浏览0
暂无评分
摘要
The planned viaduct in Jining, Shandong is a priority project in the city. However, the 63 working faces of a mine in Jining is only 3 m away from the planned viaduct, posing a serious threat to the safety of the viaduct’s construction. Consequently, it is essential to evaluate the stability of the planned viaduct’s goaf area under the influence of the 63 working faces. However, the 63 working faces are short faces, and there is a lack of corresponding prediction of surface residual subsidence. To address this issue, this paper employs theoretical analysis and numerical simulation to uncover the foundation deformation mechanism and characteristics of fractured rock and soil mass in the short goaf. Subsequently, a residual subsidence prediction method for the short goaf was proposed for the viaduct mined-out area. This new approach was implemented for the planned viaduct in Jining, and its effectiveness was validated through InSAR and leveling monitoring results. The research findings offer technical support for viaduct construction in areas affected by underground mining.
更多
查看译文
关键词
Evaluation of viaduct site,Short working face,Deformation mechanism,Surface residual deformation,Prediction method
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要