Whether the off-design characteristics of equipment should be considered in integrated energy system optimization design models - A case study

SUSTAINABLE CITIES AND SOCIETY(2024)

引用 0|浏览0
暂无评分
摘要
The operational performance of integrated energy systems (IESs) varies with their configuration. The equipment model directly influences the capacity configuration of IESs. The conventional static model assumes that equipment efficiency is constant, ignoring its off-design characteristics. For this reason, this paper establishes a dynamic model considering the off-design characteristics of the equipment. Based on the dynamic and static models, bi-level optimization models with the minimum total cost as the optimization objective are established to optimize the configuration of IESs, and the optimization results are System 1 and System 2, respectively. Then, the operational performance of the two systems under the dynamic optimal scheduling model is compared. The results demonstrate that the capacity of the absorption chiller (ABC), combined heating and power (CHP) unit in System 1 are larger than in System 2 owing to the difference in equipment models, whereas the capacity of ground source heat pumps (GSHPs) shows the opposite trend. The larger capacity of the GSHP increases the grid power consumption of System 2 but also reduces its operating efficiency. The greater operation energy con-sumption and grid power consumption make the operating cost, carbon tax, and total cost of System 2 under the design condition higher than that of System 1, with an increased rate of 1.38%, 3.47%, and 1.14%, respectively. As with the design condition, the carbon tax, operating cost, and total cost of System 2 are higher than those of System 1 under both summer and winter operating conditions, particularly under summer operating conditions, where the carbon tax, operating cost, and total cost increase by 2.27%, 1.24%, and 0.88% respectively. Even if the energy price changes, the carbon tax, operating cost and total cost of System 2 in a typical year are still greater than those of System 1. Therefore, it is necessary to consider the off-design characteristics of equipment in the bi-level optimization design model.
更多
查看译文
关键词
Integrated energy system,Bi-level optimization model,Off-design,Design and operation optimization,Performance comparison
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要