Unit Commitment Problem with Energy Storage Under Correlated Renewables Uncertainty

OPERATIONS RESEARCH(2023)

引用 0|浏览0
暂无评分
摘要
The extensive integration of renewable generation in electricity systems is significantly increasing the variability and correlation in power availability and the need for energy storage capacity. This increased uncertainty and storage capacity should be considered in operational decisions such as the short-term unit commitment (UC) problem. In this work, we formulate a day-ahead UC problem with energy storage, considering multistage correlated uncertainty on renewables' power availability. We solve this multistage stochastic unit commitment (MSUC) problem with integer variables in the first stage using a new variant of SDDP that can explicitly deal with temporal correlations. Our computational results on the IEEE 118-bus system demonstrate the significance of considering multistage uncertainty and correlations, comparing our solution with other multistage solutions, two-stage solutions, and deterministic solutions typically used by industry. We also solve the MSUC problem for a representation of the Chilean power system, finding superior UC solutions for scenarios where adapting generation to the unfolding uncertainty is costly. Finally, we demonstrate that the MSUC approach can be used to define a more efficient deterministic UC solution, outperforming the current industry practice.
更多
查看译文
关键词
energy, natural resources, stochastic programming, large-scale systems, linear programming
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要