Assessing the Effectiveness of Tailings Pond Seepage Remediation Using the Four Dimensions of “Point-Line-Surface-Body”: A Case Study

MINE WATER AND THE ENVIRONMENT(2023)

引用 0|浏览1
暂无评分
摘要
Due to nonstandard anti-seepage facilities, aging failure, and other reasons, some tailings ponds have seepage problems. After analysis of the geological and hydrogeological conditions of a lead–zinc mine tailings pond, an interception, blocking, and drainage (IBD) system engineering scheme was used to comprehensively control the seepage problems there. In addition, we assessed the effectiveness of a grout curtain from the four dimensions of the point-line-surface-body (the 4D of PLSB), including a water pressure test (point), drilling and coring survey (line), geophysical test (surface), and a group-holes pumping test (body). The proposed method provides a comprehensive and accurate understanding of grouting efficiency assessment from the perspectives of permeability and tightness.
更多
查看译文
关键词
Seepage water,IBD model,Grout curtain,Water pressure tests,ERT,Pumping test
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要