A heuristic method for production scheduling of an open pit mining operation

INTERNATIONAL JOURNAL OF MINING RECLAMATION AND ENVIRONMENT(2024)

引用 0|浏览2
暂无评分
摘要
A mathematical model for production scheduling of open pit mines maximises the net present value and satisfies the reserves, pit slope angle, and production capacity constraints. A solution to this model aims to deliver an extraction sequence and the movement of materials across various stages within the operation over a defined planning horizon. However, given that the mineral reserves delineated into thousands of mining blocks form the geological input, the model falls in the category of large-scale optimisation problems, i.e. it is computationally intractable, and exact methods cannot solve realistic scenarios of the problem. Therefore, this paper contributes an alternative to the conventional mathematical model along with a corresponding heuristic method to solve this proposed model. An implementation of the proposed method at various realistic instances reveals better performance in terms of net present value, computation time and optimality gap as compared to the traditional methods.
更多
查看译文
关键词
Scheduling,optimisation,open pit mining,heuristic methods,exact methods
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要