Markov-chain-driven optimization of inspection-based maintenance, Part II: Numerical analysis and practical insights

ELECTRIC POWER SYSTEMS RESEARCH(2024)

引用 1|浏览2
暂无评分
摘要
These two-part paper series aim to optimize the rates of inspection-based maintenance or routine-test on power system equipment. Part I introduced a novel probabilistic model using Markov chains for the inspection -based maintenance and derived the relationships between the transition rates. Part II demonstrates how the proposed method can effectively address budget and data availability constraints. It also presents the derived relationships between the optimal preventive maintenance rate and risk indices. The results presented in this paper are based on an industrial project conducted to optimize the preventive maintenance period of high-voltage equipment in Iran. Additionally, this companion paper provides practical insights, including implementation remarks, and a comprehensive dataset for failure and defect analysis, which proves useful for future research and applications.
更多
查看译文
关键词
Failure rate,Inspection,Markov chain,Preventive maintenance,Routine test
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要