Risk assessment and leakage prediction system of the water distribution system of Changzhou, China

Shuaihua Hou,Tao Tao, Chao Wang, Haiqing Zong

WATER INTERNATIONAL(2023)

引用 0|浏览1
暂无评分
摘要
In order to improve the application efficiency of intelligent monitoring equipment, leakage early warning system and water loss estimation methods under flow monitoring in different water supply areas are explored. Pressure monitoring provides risk alerts regarding unusual activity in the water distribution system in an effort to lessen or prevent catastrophic pipe bursting incidents. The location of leak points can be more accurately identified with the help of hydrophones or leak noise loggers. Furthermore, on the basis of the continuous improvement of hydraulic monitoring, a technical way to predict water quality changes through hydraulic monitoring is being developed.
更多
查看译文
关键词
leakage prediction system,water distribution system,risk assessment,changzhou
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要