Designing a Physical Model for the Emsworth Lock and Dam Filling and Emptying System

Nathan Doshi, Jacob Hancox, Polakrit Karkhai, Cameryn Smith, Adam Tawakkol, Spencer White,Elizabeth Bristow,Aaron Hill,Brad McCoy, Margaret Nowicki

Volume 8: Fluids Engineering; Heat Transfer and Thermal Engineering(2022)

引用 0|浏览0
暂无评分
摘要
Abstract Currently, the system of locks and dams within the United States operate where each system has a different component and needs different parts to complete the routine maintenance checks and procedures. Having unique components and parts for each lock and dam system drastically increases the costs required for the United States Army Corps of Engineers (USACE) to operate and maintain these locks and dams. One way to reduce these costs is to work towards and recommend standardized components for a lock and dam system. This process, especially for construction projects, is vital because it allows for simplification in the build and production stages of a project as well as life cycle maintenance. Understanding hydraulic design for the inflow and outflow of a lock system was an important consideration for this design project. Reducing hawser forces while maximizing the efficiency of the filling and emptying process is the overall goal for the design. To minimize hawser forces, mitigating the effects of hydrodynamic and hydrostatic forces is essential. This research also strives to gain additional understanding of the dynamic, turbulent nature of water in a lock and dam system. In the Emsworth Lock and Dam system, the top of rock for the riverbed is significantly higher than normal presenting unique challenges for modeling and simulation, as well as physical model construction. Critical to the design of a physical model is the determination of an adequate scaling factor that will not significantly affect the natural hydraulic processes within the system. As such, it is essential that appropriate theories are applied to remain consistent with proven methods of hydraulic scaling. Before selecting a scaling ratio, determining space limitations and a conceptual design of the model was necessary. This assisted in visualizing the model in the available spaces to ensure the design and manufacturing plan was realistic. The model contains three components: a main lock chamber, a higher elevation water reservoir, and a lower elevation water reservoir. The component that is most controlling to the design is the main lock chamber; this component cannot be altered in any way to meet the requirements of the floor space because any modifications would affect the results of the hawser force testing, and the model would not appropriately match reality. The physical model will be verified using the Froude equation — an equation that drives performance of models that are dependent on gravity. As such, when conducting any inflow or outflow of the water in the system, it is essential that the velocity is controlled such that the Froude value is consistent with that of the actual Emsworth Lock and Dam. The model must match a Froude number of 0.052 to effectively represent reality.
更多
查看译文
关键词
emsworth lock,dam filling,physical model
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要