The constructability review process in a small state highway agency: a case study

Edward Minchin, Ashish Asutosh,Dan Tran

Proceedings of International Structural Engineering and Construction(2022)

引用 0|浏览1
暂无评分
摘要
Often, after Departments of Transportation (DOTs) complete the National Environmental Policy Act (NEPA) process and procure all environmental permits on their projects, contractors or design-builders might submit ideas to improve project design. Many of these ideas would improve major aspects of the project (time, cost, quality); but, often, their implementation would change some aspect of project design that would trigger a NEPA re-evaluation or a replication of the environmental-permitting process. DOTs often hesitate or even refuse to consider these ideas, no matter how good, because they fear costly and time-consuming reassessments that would delay the project. To benefit from innovative proposed design changes on their projects, the transportation industry needs a Constructability Review Process (CRP) that will at once meet all constructability requirements and not clash with the NEPA and environmental permitting processes. This paper presents a case study investigating the current CRP implemented by the Connecticut DOT, with special focus on how the agency coordinates its CRP with the NEPA and environmental permitting processes.
更多
查看译文
关键词
constructability review process,small state highway agency,case study
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要