IOTA Proton Injector Beamline Installation

D. Edstrom Jr, D. Broemmelsiek, K. Carlson,J. -P. Carneiro, H. Piekarz,A. Romanov,A. Shemyakin, A. Valishev

arXiv (Cornell University)(2023)

引用 0|浏览6
暂无评分
摘要
The IOTA Proton Injector (IPI), currently under installation at the Fermilab Accelerator Science and Technology facility, is a beamline capable of delivering 20-mA pulses of protons at 2.5 MeV to the Integrable Optics Test Accelerator (IOTA) ring. First beam in the IPI beamline is anticipated in 2023, when it will operate alongside the existing electron injector beamline to facilitate further fundamental physics research and continued development of novel accelerator technologies in the IOTA ring. This report details the expected operational profile, known challenges, and the current state of installation.
更多
查看译文
关键词
proton injector beamline installation
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要