•Multi-unit seismic PRA elements are rigorously integrated using Bayesian networks.•Bayesian network approach to model MUSPRA estimates NPP site-based risk metrics.•Insights on the relative importance of different correlation types are provided.•Perfect ground motion correlation is not conservative.•Risk assessment case outlined in this paper provides more realistic results.
更多
查看译文
关键词
Seismic probabilistic risk assessment,Nuclear power plant,Multi-unit pra,Bayesian network,Correlated (dependent) seismic failures,Spatial variability of ground motion