Application of BIM application benefit evaluation model based on fuzzy AHP in the whole life cycle of tunnel engineering.

Xiaohong Wu, Haifeng Wu, Chenwen Zhan

Int. J. Wirel. Mob. Comput.(2023)

引用 0|浏览3
暂无评分
摘要
Tunnel engineering plays an important role in traffic planning, but it faces many problems in the process of periodic construction because of its large construction scale, long investment and construction time and prominent geological disaster risk. This paper introduces the life-cycle theory and establishes the benefit evaluation model of BIM Technology Application under the guidance of fuzzy AHP. The comprehensive operation rate of the model has been improved by 59.9% under both the construction level and the operation level of the project. And the weight score of some engineering indicators is also more than 90 points, which greatly improves the project management-level and coordination efficiency. This model can effectively provide new application ideas for engineering construction, and establish the benefit evaluation system of BIM application in the whole life cycle.
更多
查看译文
关键词
fuzzy ahp,engineering
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要