Current Status of Decommissioning and Waste Management at the Ningyo-Toge Environmental Engineering Center

Yusuke Ohashi, Masamitsu Shimaike, Takashi Matsumoto,Nobuo Takahashi,Kaoru Yokoyama, Yasuyuki Morimoto

NUCLEAR TECHNOLOGY(2023)

引用 0|浏览3
暂无评分
摘要
At the Ningyo-Toge Environmental Engineering Center, technical developments related to uranium refining conversion and enrichment have been completed and decommissioning of these facilities has begun. The error between the quantity of dismantled materials estimated from the facility design drawings and the actual quantity of the dismantled materials was about 1.7% when averaged over the entire facilities already dismantled. Most of the dismantled materials, which have no contamination history and were properly managed, were confirmed to have surface radioactivity concentrations below the detection limit and could be carried out to recyclers as nonradioactive (NR) waste. The dismantled materials that could not be certified as NR needed to be cleared and reused. By evaluating two types of gamma rays of Pa-234m from the mockup dismantled objects, it was found that uranium corresponding to a clearance level (1.2 x 10(2) Bq/kg) could be quantified.
更多
查看译文
关键词
Decommissioning,uranium,nonradioactive waste,clearance level,nondestructive assay
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要