A two-stage stochastic programming model for electric substation flood mitigation prior to an imminent hurricane

arxiv(2023)

引用 0|浏览2
暂无评分
摘要
We present a stochastic programming model for informing the deployment of ad hoc flood mitigation measures to protect electrical substations prior to an imminent and uncertain hurricane. The first stage captures the deployment of a fixed number of mitigation resources, and the second stage captures grid operation in response to a contingency. The primary objective is to minimize expected load shed. We develop methods for simulating flooding induced by extreme rainfall and construct two geographically realistic case studies, one based on Tropical Storm Imelda and the other on Hurricane Harvey. Applying our model to those case studies, we investigate the effect of the mitigation budget on the optimal objective value and solutions. Our results highlight the sensitivity of the optimal mitigation to the budget, a consequence of those decisions being discrete. We additionally assess the value of having better mitigation options and the spatial features of the optimal mitigation.
更多
查看译文
关键词
electric substation flood,imminent hurricane,two-stage
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要