A new 3MW ECRH system at 105 GHz for WEST

Fusion Engineering and Design(2023)

引用 4|浏览36
暂无评分
摘要
The aim of the WEST experiments is to master long plasma pulses (1000s) and expose ITER-like tungsten wall to deposited heat fluxes up to 10 MW/m2. To increase the margin to reach the H-Mode and to control W-impurities in the plasma, the installation of an upgraded ECRH heating system, with a gyrotron performance of 1MW/1000s per unit, is planned in 2023. With the modifications of Tore Supra to WEST, simulations at a magnetic field B0∼3.7T and a central density ne0∼6 × 1019 m−3 show that the optimal frequency for central absorption is 105 GHz. For this purpose, a 105 GHz/1MW gyrotron (TH1511) has been designed at KIT in 2021, based on the technological design of the 140 GHz/1.5 MW (TH1507U) gyrotron for W7-X. Currently, three units are under fabrication at THALES. In the first phase of the project, some of the previous Tore Supra Electron Cyclotron (EC) system components will be re-installed and re-used whenever possible. This paper describes the studies performed to adapt the new ECRH system to 105 GHz and the status of the modifications necessary to re-start the system with a challenging schedule.
更多
查看译文
关键词
Launcher,Gyrotron,Electron cyclotron heating system,WEST
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要