Status of the RAON project in Korea

AAPPS Bulletin(2023)

引用 1|浏览8
暂无评分
摘要
A new rare-isotope beam (RIB) accelerator complex, RAON, is under construction in South Korea. RAON employs two RIB production methods, namely, isotope separation online (ISOL) and in-flight fragmentation (IF). According to the original design, ISOL and IF can run independently, and RAON ultimately combines them to provide more neutron-rich ion beams for the experiments. In 2021, due to the delay in developing high-energy superconducting cavities and modules, it was decided to proceed with the RAON construction project in two steps. In the first phase, the injector system, the low-energy accelerator system, ISOL, the IF separator, and all experimental devices will be completed by the end of 2022. The high-energy accelerator system will be developed, manufactured, installed, and commissioned in the second phase. In this article, the status of the superconducting accelerators, RIB production systems, and experimental equipment for RAON is reviewed.
更多
查看译文
关键词
RAON, Superconducting linac, ISOL, In-flight fragmentation, Rare-isotope beams, Nuclear structure, Nuclear astrophysics, Equation of state
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要