The roadmap towards the efficiency limit for supercritical carbon dioxide coal fired power plant
Energy Conversion and Management(2022)
摘要
•A roadmap is proposed to reach the limit efficiency.•The roadmap reflected in general analysis and practical analysis of sCO2 cycle.•TC achieves the second largest contribution for efficiency increment after RH.•The limited efficiency for sCO2 coal fired power plant is over 51%.
更多查看译文
关键词
sCO2 cycle,Efficiency limit,Coal-fired power plant,Overlap energy utilization,Module boiler design
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要