•A roadmap is proposed to reach the limit efficiency.•The roadmap reflected in general analysis and practical analysis of sCO2 cycle.•TC achieves the second largest contribution for efficiency increment after RH.•The limited efficiency for sCO2 coal fired power plant is over 51%.
更多
查看译文
关键词
sCO2 cycle,Efficiency limit,Coal-fired power plant,Overlap energy utilization,Module boiler design