Different Toppling Bank Slope Failures under Hydrodynamic Action during Impoundment of the Miaowei Hydropower Station Reservoir

WATER(2022)

引用 2|浏览1
暂无评分
摘要
Toppling is a common deformation and failure phenomenon in the reservoir bank slopes of hydropower projects. This paper studies the genesis and evolution of different toppling bodies during water impoundment at the Miaowei Hydropower Station Reservoir on the Lancang River in southwest China. Toppling properties were determined and second failure characteristics analyzed in different reservoir impoundment stages. Different degrees of toppling deformation were primarily affected by the transverse bending stress, while the regional tectonic stress has been shown to have a significant effect on the transverse bending of the rock layers. Combined with the on-site investigation and monitoring results, the failure mechanisms of the different toppling deformation bodies were analyzed. The second failure of the toppling rock mass caused by the reservoir impoundment process is mainly the hydrodynamic splitting along fractures, wave impaction and softening on the slope foot. The transverse bending effect of gravity is transmitted upward through joint misalignment, rotation and slip, accelerating the speed of secondary toppling failure and forming a compression-shear failure along the toppling tension crack. A model to predict the scope and time of failure in the toppling deformation banks under the action of reservoir hydrodynamics was proposed.
更多
查看译文
关键词
toppling deformation rock mass, hydrodynamic action, compression-shear failure, failure prediction model, secondary toppling failure
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要