Research on Key Risk Factors and Risk Transmission Path of Procurement in International Engineering Procurement Construction Project

BUILDINGS(2022)

引用 4|浏览19
暂无评分
摘要
As the core link of Engineering Procurement Construction (EPC) projects, procurement involves a huge amount of money and has a wide range of influence. Once the procurement risks of EPC projects occur, it is easy to cause a domino effect, which can have a huge impact on the cost, schedule and quality of the construction project. Therefore, this paper took international EPC projects as the research object, identifying 25 risk factors related to procurement through case analysis, literature analysis and expert interviews. Integrated Interpretative Structural Modelling (ISM) and Cross-Impact Matrix Multiplication Applied to Classification (MICMAC) method was used to establish the interrelationships between risk factors. Based on the results, procurement risk transmission paths for international EPC projects are developed, and key risk factors are found. Moreover, corresponding risk management suggestions are put forward. The research results impel contractors of the international EPC projects to pay close attention to the key risk factors in the project procurement process. After recognizing the risk transfer path, contractors can take measures to avoid risk to reduce the possibility of project failure as soon as possible. This research can provide support for managing procurement risk in the international EPC project.
更多
查看译文
关键词
international EPC projects, procurement risk, key risk factors, risk transmission path, ISM, MICMAC
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要