Model-Predictive Control for the Three-Tank System Utilizing an Industrial Automation System

ACS OMEGA(2022)

引用 0|浏览0
暂无评分
摘要
A three-tank process has difficulty in controller design because of nonlinear flow and interactions between tanks. This paper addresses the design methodology of the model-predictive controller (MPC) for the three-tank system. The control performance of the proposed MPC controller is compared with the proportional plus integral (PI) controller by both simulations and experiments on the real three-tank pilot with the industrial ABB 800th automation system. The MPC controller shows a faster response for the two tanks: In the simulation, the settling times are about 120 s for both tanks of the MPC controller. On the other hand, the settling times for the PI controller are about 200 s for the first tank and ISO s for the second tank. The experiments confirm these results.
更多
查看译文
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要