Performance-Based Evaluation of Energy Dissipating Hysteretic Infilled Reinforced Concrete Frame Based on Cyclic Tests

JOURNAL OF EARTHQUAKE ENGINEERING(2023)

引用 0|浏览0
暂无评分
摘要
The detachment of the infill with the RC frame starts at a low level of drift that triggers several undesirable modes of failure of the infill itself as well as within the frame. The proposed research intends to develop an alternative infill wall system with large deformation capability without collapse and a large energy dissipation capacity. It comprises slotted blocks with the energy dissipating link elements. The results show that the energy dissipating hysteretic infills can minimize the undesirable characteristic effects and achieve enhanced performance limit states even under the collapse prevention damage state.
更多
查看译文
关键词
Energy dissipating hysteretic infill,cyclic testing,passive energy dissipator,two-story frame testing,performance-based evaluation
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要