Optimizing a stochastic disassembly line balancing problem with task failure via a hybrid variable neighborhood descent-artificial bee colony algorithm

INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH(2023)

引用 8|浏览12
暂无评分
摘要
A disassembly line is an effective disassembly system to recover end-of-life products. In real life, as end-of-life products are subject to varying degrees of wear and tear, task failure may occur in the disassembly process. In this paper, the task failure risks are considered, and an expected profit-based stochastic disassembly line balancing problem is studied. First, a mathematical model is presented to maximise the expected recovering profit with task failures. Then, a hybrid metaheuristic approach is developed to efficiently solve the proposed model, which is integrated with a variable neighbourhood descent method and an artificial bee colony algorithm. Finally, the effectiveness and robustness of the proposed algorithm are verified by three cases, and experiment results show that the solution performance of the proposed approach is superior to the other three existing methods.
更多
查看译文
关键词
Disassembly line balancing problem, task failure, expected profit, variable neighborhood descent method, artificial bee colony algorithm
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要