MitC: Open-source software for construction project control and delay mitigation

SoftwareX(2022)

引用 2|浏览2
暂无评分
摘要
Changes in a construction project schedule can impact the project’s planned duration, resulting in penalties. A manual trial-and-error probabilistic approach is usually conducted to find an appropriate set of corrective measures to mitigate delays of the overall project. However, this approach does not capture the actual goal-oriented behavior of project managers who react to the actual scenarios causing delays, leading to a fundamental modeling error. Moreover, it does not employ control and automation concepts when finding the optimal mitigation strategy. To remove this modeling error and to automate the mitigation process, the Mitigation Controller (MitC) software is developed. The MitC searches for the most cost-effective set of mitigation measures considering risk events and durations uncertainties of activities. Moreover, the MitC captures activity correlations and enables contractual penalty/reward schemes in the simulation. As a result, it returns the most effective mitigation strategy that minimizes the mitigation cost and penalty and maximizes the reward potential. The Mitigation Controller introduced here constitutes an open-source code written in Matlab© language and a Graphical User Interface (GUI) to facilitate its use. This application of control concepts has not yet been incorporated in the industrial tools (e.g., Primavera) or the scientific construction scheduling literature.
更多
查看译文
关键词
Risk,Uncertainty,Corrective measure,Project scheduling,Time-cost optimization,Monte Carlo simulation,Penalty and reward,Activity correlation
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要