Optimal configuration of park-level integrated energy system considering integrated demand response and construction time sequence

ENERGY REPORTS(2022)

引用 6|浏览2
暂无评分
摘要
Park-level integrated energy system (PIES) is a typical application of multi-energy coupling and supply, whose configuration can effectively improve its energy efficiency. A PIES optimal configuration model considering integrated demand response (IDR) and construction time sequence is proposed in this paper to further stimulate the multi-energy complementary and improve the planning economy of PIES. First, PIES considering IDR is modeled and the mathematical models of energy conversion and storage devices are established. Then, the PIES configuration model considering IDR and construction time sequence is established. Finally, a case study on an electric-heat coupling commercial PIES is carried out to demonstrate the effectiveness of the proposed model, which shows that the proposed model is effective in terms of improving the device utilization rate, cutting the planning costs of PIES and realizing "peak-cutting and valley-filling". (c) 2022 The Author(s). Published by Elsevier Ltd. This is an open access article under the CC BY license (http://creativecommons.org/licenses/by/4.0/). Peer-review under responsibility of the scientific committee of the 2021 The 2nd International Conference on Power Engineering, ICPE, 2021.
更多
查看译文
关键词
Park-level integrated energy system, Multi-stage planning, Integrated demand response, Construction time sequence
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要