A comprehensive evaluation of process kinetics: A plant-wide approach for nutrient removal and biogas production
Water Research(2022)
摘要
•Low nitrification and hydrolysis rates were found for Istanbul wastewaters.•Anaerobic hydrolysis was the bottleneck in biogas production.•Nitrification can be recovered at marginal MLSS concentrations without settling disturbance.•Optimal process design requires validated intrinsic parameters.
更多查看译文
关键词
Anaerobic hydrolysis,Lysis rate,Nitrification,Dynamic simulation,Biogas yield,Full-scale wastewater treatment plant
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要