Application of temporary reinforcement technology in insufficient construction of the understructure bearing capacity of viaduct

Guohui Cao,Liu Reqiang,Jing Liu, Gao Xiang, Wang Peng

E3S Web of Conferences(2019)

引用 0|浏览0
暂无评分
摘要
The complex three-dimensional traffic construction often occur when the lower structure cannot bear the construction load and other special cases, indicating the need for temporary reinforcement of the lower structure. In this paper, combined with a project construction example, various temporary reinforcement technologies are adopted to solve the insufficient bearing capacity during understructure construction, which poses a serious danger, to ensure synchronous construction of the understructure and viaduct. Compared with the traditional construction technology, the temporary reinforcement technology proposed in this paper features the advantages of saving project cost and time and has achieved better economic and social benefits.
更多
查看译文
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要